Project · FIVES FCB · 2015

Strengthening of Clinker Silo’s Wall by Shotcreting 300mm thickness Concrete at QNCC

WET SHOTCRETE

Featured image for Strengthening of Clinker Silo’s Wall by Shotcreting 300mm thickness Concrete at QNCC

Delivered work

Project scope

WET SHOTCRETE

Scope of Works:

  • Cleaning and reshaping the horizontal area to allow proper installation of foils or HDPE sheet 1.5mm.

  • Fixing 1.5mm thick HDPE sheet by mechanical fixation using aluminum strip, nails and cartridges.

  • Laying 2 layers of 1mm thick Aluminum Foils on the horizontal area.

  • Fixing first layer of steel reinforcement.

  • Apply 150mm thick shotcrete using C40 concrete.

  • Fixing second layer of steel reinforcement.

  • Apply 150mm thick shotcrete using C40 concrete.

  • Smoothing the surface using pre-packed mortar.