Project scope

STRENGTHENING USING CARBON FIBER

Scope of Works:

  1. Opening slots 800X200X280mm for post tension cables and pouring epoxy grout for blocking the cables to be cut

  2. Back-propping

  3. Removing laitance from the direction of Carbon Fiber

  4. Alignment for the direction of Carbon Fiber Fixation.

  5. Fixing Carbon Fiber from underneath – Sika Carbodur S1012.

  6. Cutting the concrete slab & demolishing.

  7. Fixing Carbon Fiber from up – Sika Carbodur S1012