Scope of Works:
Chipping loose concrete if any.
Sandblasting the exposed steel rebars to remove the rust.
Apply protective coating, SikaTop Armatec 110 for all exposed steel rebars.
Fixing steel shutter and opening on the steel shutter for fixing accessories.
Sealing all around the shutter using Sikadur 31 CF Slow.
Mixing and pumping Sikacrete 113PP using form & pump technique.
Removing shutter and curing for 3 days.