Skip to main content

Project · QDVC-BIN OMRAN JV · 2016

Pier Repairing at NOH-2 project

CONCRETE REPAIR & GROUTING

Featured image for Pier Repairing at NOH-2 project

Delivered work

Project scope

CONCRETE REPAIR & GROUTING

Scope of Works:

  • Chipping loose concrete if any.

  • Sandblasting the exposed steel rebars to remove the rust.

  • Apply protective coating, SikaTop Armatec 110 for all exposed steel rebars.

  • Fixing steel shutter and opening on the steel shutter for fixing accessories.

  • Sealing all around the shutter using Sikadur 31 CF Slow.

  • Mixing and pumping Sikacrete 113PP using form & pump technique.

  • Removing shutter and curing for 3 days.